For architectsand builders.
We work inside your drawing set and your schedule.
Here is how we coordinate a wall of millwork with the trades around it, the documents that help, and who usually does what.
Sheet A-10.1 · A coordination elevation
Seven thingswe will ask about.
A kitchen wall as we draw it for a builder: the millwork, and every place it meets the house or another trade.
- 1Ceiling datum
Ceilings are rarely level. We leave a scribe strip at the top and plane it to the ceiling on site.
- 2Blocking
Solid blocking behind anything wall-hung, located on our blocking plan, installed before drywall.
- 3Appliance opening
Sized from the appliance maker’s installation sheet, with its required clearances.
- 4Outlets
Located on our elevations so they land in a back panel or a backsplash, not behind a drawer.
- 5Plumbing zone
Supply and drain kept inside a marked zone, so drawers can be cut around it.
- 6Finished floor
We build from finished floor. Tell us its height and when it goes down.
- 7Scribe at the wall
An allowance at each wall end, planed to the plaster or drywall on site.
What helps
Send us what you have.
- Plans, elevations and sectionsPDF is fine; CAD files if you have them.
- Appliance and plumbing fixture sheetsThe installation sheets, not the brochures: we build openings to them.
- Finish and hardware schedulesSo our finished board matches the rest of the house.
- Framing informationWhere cabinets will hang, so blocking goes in before the walls close.
- Site photographs and the scheduleWhen the walls close, when the floor goes down, when other trades are in.

Sheet A-10.2
Who usually does what.
Every project divides the work its own way; this is where we usually start the conversation.
| Item | Harlan & Reed | The project team |
|---|---|---|
| Field dimensions | Verified on site once the walls are closed | Tell us when they are |
| Appliances | Openings built to the installation sheets | Selected and supplied by the owner or builder |
| Electrical | Outlets and lights located on our elevations | Installed by your electrician |
| Plumbing | Cutouts and clear zones shown on our drawings | Connected by your plumber |
| Blocking | A blocking plan for every wall-hung piece | Installed by the builder before close-up |
| Countertops | Boxes set and level for templating | Templated, made and set by the fabricator |
| Finish approval | A finished board from the shop’s own tins | Approved by the owner and architect |
Bring us inearly.
The earlier we see the drawings, the fewer surprises at the wall. Start a consultation as the project’s architect or builder and we will ask for the right things.